Incorrect password — try again
Integrated Management System
Thurrock Engineering Supplies - ISO 9001 · ISO 14001 · ISO 45001
15
Sections documented
5
Sections requiring review
3
Standards covered

Audit readiness - clause coverage

Click any row to jump to that section.

ClauseNameStatusNotes
4.1Organisation context✓ DocumentedIMS purpose and structure defined
4.2Interested parties⚠ DraftParties identified; needs/expectations need confirming
4.3Scope & boundaries✓ DocumentedIn-scope / out-of-scope defined
4.4IMS processes✓ DocumentedOperational and system processes described
5.1Leadership commitment✓ DocumentedEndorsed by directors 2 Apr 2026
5.2Policy✓ DocumentedApproved by directors 2 Apr 2026; next review 2 Apr 2027
5.3Roles & responsibilities✓ DocumentedTraining matrix defines role-level responsibilities
6.1Risks & opportunities⚠ DraftRisk register seeded - needs validation
6.2Objectives & targets⚠ DraftPlaceholder objectives need confirmation
7.1Resources✓ DocumentedPremises, IT/cloud and monitoring resources identified
7.2Competence & training✓ DocumentedTraining matrix complete; records in BrightHR
7.3Awareness✓ DocumentedInduction, portal and monthly H&S briefing
7.4Communication✓ DocumentedChannels & frequencies confirmed; monthly H&S consultation
7.5Documented information✓ DocumentedThis IMS is the document control system
8.xOperational planning & control✓ DocumentedSystems, platforms, and integrations documented
9.1Monitoring & measurement⚠ DraftKPI framework to be confirmed
9.2Internal audit✓ DocumentedIA-2026-01 completed 30 Jun 2026; report on file
9.3Management review✓ DocumentedMR-2026-01 held 30 Jun 2026; minutes await director signature
10.1Nonconformance & corrective action✓ DocumentedRegister in active use; audit findings logged
10.2Continual improvement⚠ DraftImprovement log to be populated
How to use this IMS: Click any row above to jump to that clause. Sections marked ⚠ Draft contain placeholder content - review and update them before the audit. Use the Document Library (sidebar) to attach and link real files.
4.1 - Understanding the Organisation
Internal and external issues relevant to TES and its IMS

About Thurrock Engineering Supplies

Thurrock Engineering Supplies (TES) is a UK-based distributor of engineering supplies and industrial products, operating as a trade and B2B supplier. TES serves customers primarily through its B2B eCommerce platform (TESXpress on BigCommerce) and direct trade relationships.

TES operates an Integrated Management System (IMS) covering quality management (ISO 9001), environmental management (ISO 14001), and occupational health & safety (ISO 45001). The IMS is designed to be practical, operational, and directly aligned with how TES systems and processes actually work.

Internal context

Strengths

  • Strong eCommerce infrastructure (BigCommerce + TESXpress)
  • Centralised ERP system (OrderWise) for operational control
  • End-to-end order-to-invoice traceability
  • Documented technical processes and integrations
  • Custom product documentation system for compliance

Areas for development

  • Formal quality and environmental objectives not yet formalised
  • Internal audit programme to be established
  • Management review cadence to be formalised
  • Nonconformance recording to be implemented

External context

Market & commercial

  • B2B engineering supply sector - quality and reliability expectations
  • Customer compliance requirements (UKCA, product certifications)
  • Competitive pricing pressure and delivery performance

Regulatory & legal

  • UK PUWER / LOLER regulations (where applicable)
  • Product safety and UKCA marking requirements
  • Health & Safety at Work Act 1974
  • Environmental legislation (waste, packaging)
  • GDPR / UK data protection
4.2 - Interested Parties
Relevant stakeholders and their needs
⚠️
DRAFT - Requires review

Confirm that interested parties and their needs/expectations are accurately described before the audit.

Interested partyRelationshipNeeds / expectationsStandard(s)
B2B customersEnd users of TES productsOn-time delivery, correct product, compliant documentation, responsive service9001
SuppliersProduct and service providersTimely purchase orders, clear specifications, prompt payment9001
TES employeesInternal workforceSafe working environment, clear procedures, fair management, training9001, 45001
TES directors / managementLeadership and governanceLegal compliance, financial performance, operational continuity9001, 14001, 45001
Regulatory bodies (HSE, EA)Enforcement and oversightLegal compliance with H&S and environmental legislation14001, 45001
Certification body / auditorsThird-party assuranceEvidence of documented IMS, conformance with standards9001, 14001, 45001
Local communityNeighbouring stakeholdersMinimal environmental impact from operations14001
Logistics partners / couriersDelivery fulfilmentClear despatch instructions, timely handover9001
4.3 - Scope & Boundaries
What the IMS covers and what it explicitly does not

In scope

The IMS covers operational systems and processes used by TES to support sales, purchasing, fulfilment, and financial posting.

Systems in scope

  • eCommerce platforms (BigCommerce, TESXpress)
  • ERP and operational systems (OrderWise)
  • Accounting systems used for posting and reporting (Sage 50)
  • Supporting infrastructure and services required to operate the above

Processes in scope

  • Customer ordering and order intake · Stock management and availability
  • Purchase order creation and goods receipt
  • Sales order processing and fulfilment · Invoicing and financial posting
  • System integrations and data flows · Manual control points and validation steps

Out of scope

People management & HR

Employment policies, training delivery records, performance management, and H&S procedures are managed in BrightHR.

Financial accounting controls

Nominal ledger, VAT, banking, reconciliation, and statutory financial reporting are managed within Sage 50.

Legal & regulatory documentation

Contracts, terms & conditions, product compliance documentation, and regulatory filings.

Vendor internal logic

Vendor-managed systems are documented at integration and usage level only.

4.4 - IMS Processes
The processes that make up the TES Integrated Management System
ProcessDescriptionKey systemsOwnerIMS section
Order intakeReceiving customer orders via TESXpress or direct channelsBigCommerce, TESXpressOperations8.1, 8.3
Order processingCreating, validating, and confirming sales orders in ERPOrderWiseOperations8.2, 8.3
FulfilmentPicking, packing, and despatching goods to customersOrderWiseWarehouse8.4
Stock managementMaintaining stock levels, movements, and replenishmentOrderWiseOperations8.2
PurchasingCreating POs, receiving goods, managing suppliersOrderWisePurchasing8.2
InvoicingRaising sales invoices and posting to accountingOrderWise, Sage 50Finance8.2, 8.4
System integrationAutomated data flows between eCommerce and ERPBigCommerce, OrderWiseTechnical8.3
HR & trainingStaff management, competence, and training recordsBrightHRManagement7.2
Document managementCreating, controlling, and maintaining IMS documentationThis IMS portalAll7.5
Performance monitoringKPI tracking, audits, and management reviewMultipleManagement9.x
Nonconformance & improvementCapturing issues and driving corrective actionRegister (10.1)All10.x
5.1 - Leadership & Commitment
Top management commitment to the IMS
✓ Endorsed by Luke Keenan & Ross Keenan (Directors) on 2 April 2026, alongside the IMS policy. Reviewed annually.

Statement of commitment

TES management is committed to establishing, implementing, maintaining, and continually improving the Integrated Management System in accordance with ISO 9001, ISO 14001, and ISO 45001. This commitment includes setting and communicating the integrated policy, providing necessary resources, promoting a culture of continual improvement, and conducting management reviews.

Customer focus (ISO 9001 §5.1.2)

  • Maintaining accurate product and stock data across all customer-facing systems
  • Ensuring order-to-delivery traceability for all customer orders
  • Capturing and responding to customer feedback and complaints
  • Supporting compliance purchasing with product documentation

H&S leadership (ISO 45001 §5.1)

  • Taking overall accountability for prevention of work-related injury and ill health
  • Ensuring H&S hazards are identified and risks assessed
  • Ensuring workers are consulted and participate in H&S matters
  • Supporting incident, hazard, and near-miss reporting without fear of reprisal
5.2 - Policy
Quality, Environmental, and Health & Safety policies
✓ Approved by Luke Keenan & Ross Keenan (Directors) on 2 April 2026. Next review due 2 April 2027.

Integrated Management System Policy

TES is committed to providing high-quality engineering supplies, operating in an environmentally responsible manner, and maintaining a safe and healthy workplace for all our people.


Quality (ISO 9001)

  • Consistently meet or exceed customer requirements for product quality, accuracy, and delivery
  • Maintain documented processes that reflect how we actually operate
  • Continually improve systems and processes based on evidence and feedback

Environment (ISO 14001)

  • Minimise environmental impact in warehouse and office operations
  • Comply with applicable environmental legislation
  • Reduce waste from packaging, consumables, and operations

Health & Safety (ISO 45001)

  • Provide a safe and healthy workplace for all employees and visitors
  • Eliminate hazards and reduce H&S risks to the lowest practicable level
  • Consult workers on H&S matters and encourage participation
  • Comply with applicable health & safety legislation

Approved by: Luke Keenan & Ross Keenan (Directors)    Date: 2 April 2026    Review date: 2 April 2027 (annual)

5.3 - Roles & Responsibilities
Who is responsible for what within the IMS
RoleIMS responsibilityKey systems
TES DirectorsPolicy approval; management review; overall accountability for IMS conformance and improvementAll
Operations (Sales)Order processing accuracy; customer communication; PO reference handling; exception escalationOrderWise, TESXpress
Operations (Warehouse)Accurate picking and packing; despatch documentation; stock discrepancy reportingOrderWise
Operations (Purchasing)Supplier PO management; goods receipt accuracy; stock availabilityOrderWise
FinanceInvoice posting accuracy; Sage 50 maintenance; financial reportingOrderWise, Sage 50
Web & Platforms (Tom)System configuration, integrations, and platform maintenance; IMS documentation maintenanceBigCommerce, TESXpress, OrderWise, Infrastructure
HR / ManagementStaff records, training, absence management; H&S complianceBrightHR
6.1 - Risks & Opportunities
Risks and opportunities identified for the IMS
⚠️
DRAFT - Requires validation

Review each entry for accuracy, likelihood, and current controls before the audit. Add any missing risks.

RefRisk / OpportunityStandardLikelihoodImpactCurrent controlAction required
R01BC→OW integration failure causing missed orders9001MediumHigh20-min poll; deduplication logic; manual check process documentedAdd automated alerting for integration failures
R02Customer account not linked - blocking order import9001MediumMediumPrecondition check; ops review processReview customer onboarding process
R03Incorrect product despatched due to picking error9001LowHighPicking documentation from OrderWise; check before despatchConfirm pick verification procedure is documented
R04Key person dependency - platform knowledge held by single individual9001HighHighThis IMS portal reduces knowledge concentrationEnsure all platform docs are current and complete
R05Packaging waste disposal non-compliance14001LowMediumStandard waste contractor arrangementsConfirm waste contractor is licensed; document process
R06Manual handling injury in warehouse45001MediumHighManual handling training; equipment availableConfirm training records in BrightHR
R07Slip/trip hazard in warehouse45001MediumMediumHousekeeping standards; regular inspectionsDocument inspection frequency and records
O01Improved customer satisfaction through compliance documentation on product pages9001-PositiveProduct Docs system (docs.tesnet.uk) in placeMeasure customer feedback on document availability
O02Reduced environmental impact through packaging optimisation14001-PositiveNot yet formalisedEstablish packaging review process
6.2 - Objectives & Targets
Quality, environmental, and H&S objectives for TES
⚠️
DRAFT - Requires confirmation from management

Confirm measures, targets, and owners with management before the audit.

ObjectiveStandardMeasureTargetOwnerReview
Maintain on-time order fulfilment9001% orders despatched on committed date≥95%OperationsMonthly
Zero order duplicates from integration9001Duplicate orders in OrderWise0Web & PlatformsMonthly
IMS documentation kept current9001Pages updated within 30 days of system changes100%AllQuarterly
Reduce packaging waste14001Packaging waste per order (kg)TBD - baseline firstWarehouseQuarterly
Zero reportable H&S incidents45001RIDDOR-reportable incidents0 per yearManagementMonthly
H&S training up to date for all staff45001% staff with current mandatory training (BrightHR)100%HRQuarterly
All nonconformances closed within target9001, 14001, 45001% NCRs closed within agreed timeframe≥90%ManagementQuarterly
7.1 - Resources
Infrastructure, environment for operations, and monitoring resources
✓ Documented — premises, IT/cloud systems and monitoring resources identified. Detailed hosting arrangements are maintained under 8.5 Infrastructure.

7.1.3 Infrastructure

Physical

  • Warehouse and office premises - Unit 1 Motherwell Way, West Thurrock, Grays, RM20 3XD
  • Picking, packing, and despatch equipment
  • Manual handling equipment
  • IT hardware (workstations, printers)

Digital / cloud

  • BigCommerce platform (SaaS - vendor managed)
  • OrderWise ERP (locally hosted or vendor managed - confirm)
  • Sage 50 accounting · BrightHR (SaaS)
  • Static hosting for corporate site (Apache2)
  • docs.tesnet.uk - internal product document system

7.1.4 Environment for operations

TES maintains an appropriate working environment including clean, organised warehouse with adequate lighting, safe manual handling arrangements, and adequate workstation provision for office-based processing.

7.1.5 Monitoring & measurement resources

TES is a distributor and does not rely on measurement equipment to determine product conformity — goods are supplied to manufacturer specification with supporting documentation (see docs.tesnet.uk). Any despatch scales are used for indicative weights only and are not calibrated measurement devices. No calibration programme is therefore required; this position is reviewed annually.

7.2 - Competence & Training
Required competence by role; training records held in BrightHR
Training delivery, records, and certificates are managed in BrightHR. This matrix defines who needs to know what.

Competence levels

LevelDescription
AwarenessGeneral understanding of the system or process
UserAble to use the system as part of day-to-day work
Power userAble to handle exceptions and non-standard cases
AdministratorAble to configure, maintain, or change the system

Training matrix - systems & platforms

RoleTESXpressOrderWiseSage 50BrightHRNotes
Operations (Sales)UserUserAwarenessN/AOrder processing & customer interaction
Operations (Warehouse)AwarenessUserN/AN/APicking, packing, despatch
Operations (Purchasing)AwarenessPower userAwarenessN/APO creation & goods receipt
FinanceAwarenessUserPower userN/AInvoicing & posting
ManagementAwarenessAwarenessAwarenessUserOversight & approvals
Web & PlatformsAdministratorAwarenessAwarenessAwarenessSystem configuration & integrations
7.3 - Awareness
How staff are made aware of IMS requirements
✓ Documented — staff awareness is delivered through induction, the IMS portal, and the monthly H&S slot in the weekly staff meeting.

IMS awareness requirements

All TES staff should be aware of: the TES IMS policy; their contribution to IMS effectiveness; the benefits of improved performance; and the implications of not conforming with IMS requirements.

MethodAudienceFrequencyOwner
Induction trainingAll new startersOn joiningHR / Management
IMS portal accessAll staffOngoingWeb & Platforms
Team meetings / briefingsOperational teamsWeekly (monthly H&S slot)Management
Policy displayAll staffPermanentManagement
Management review outputsRelevant staffQuarterlyManagement
7.4 - Communication
Internal and external communication relevant to the IMS
✓ Documented — communication channels and frequencies confirmed, including monthly H&S worker consultation in the staff meeting (ISO 45001).
TopicAudienceChannelFrequencyOwner
IMS policyAll staffPortal, physical notice boardAt induction; on policy changeManagement
System changes & updatesAffected staffDirect briefing / emailAs requiredWeb & Platforms / Operations
H&S hazards and risk controlsAll staffToolbox talks / team meetingsMonthly (H&S slot)Management
Incident and near-miss reportingAll staffBrightHR / direct reportImmediate on occurrenceManagement
Management review outputsRelevant staffMeeting notes / emailQuarterlyManagement
Audit findingsRelevant functionsNonconformance register (10.1)Post-auditManagement
7.5 - Documented Information
How the IMS is controlled as documented information

Document control principles

  • Documents are available to staff via this portal
  • Content is updated whenever systems change, integrations are modified, or processes are updated
  • Each section identifies ownership and last verification date
  • Live operational records are held in their source systems - not duplicated here
CategoryExamplesControlled in
IMS documentationThis portal - all sectionsIMS portal
Operational recordsSales orders, invoices, delivery notes, POsOrderWise
Financial recordsNominal ledger, VAT returns, bank reconciliationsSage 50
HR recordsEmployee records, training certificates, absence recordsBrightHR
Product documentationDatasheets, UKCA declarations, certificatesdocs.tesnet.uk
Audit recordsInternal audit reports, nonconformancesIMS portal (9.2, 10.1)
Document library filesExample POs, quotes, certs, training recordsIMS portal - Document Library
8.0 - System Inventory
All TES systems, platforms, and services in scope
SystemTypePurposeStatusOwner
TESXpressCustomer commerce platformB2B eCommerce experience for TES customersActiveTom
BigCommerceeCommerce engineProduct catalogue, checkout, order captureActiveTom
SparkLayerB2B commerce engineB2B pricing, accounts, and checkout logicActiveTom
OrderWiseERPStock, purchasing, sales, invoicingActiveTES
Sage 50Accounting softwareFinancial accounting & VAT reportingActiveTES Directors
Apache2 static siteWebsiteCorporate landing siteActiveTom
BrightHRHR management platformStaff management & HR complianceActiveTES Directors
docs.tesnet.ukInternal web appProduct document managementActiveTom
8.1 - TESXpress
BigCommerce Stencil theme - B2B storefront at b2b.thurrockengineering.com

Location & traceability

Git repositoryTomHallTES/TESXpress
Local dev pathC:\dev\bc
Production domainb2b.thurrockengineering.com
PlatformBigCommerce (Stencil)
DeploymentStencil CLI
OwnerTom Hall
Last verified2026-01-26

Purpose & context

Custom BigCommerce Stencil theme solving core B2B requirements:

  • Technical documentation display (datasheets, certificates)
  • Compliance-driven purchasing (UKCA, EU conformity)
  • Fast product navigation for repeat B2B customers
  • Safe extension with custom apps and integrations

Deployment

# Build (validation)
stencil bundle

# Deploy to BigCommerce
stencil push

# Deploy and activate
stencil push -a

Product Documents System

TESXpress integrates with docs.tesnet.uk - attaches compliance documents to products by SKU. Documents appear automatically under the Documents tab on BigCommerce product pages.

Known issues

Stencil 401 error (channels)

Symptom: Could not fetch a list of the store channels (401)

Cause: Expired or deleted BigCommerce API token

Fix: Run stencil init and create a new API token.

8.2 - OrderWise (ERP)
Core ERP for stock, purchasing, sales, and invoicing

Stock management

  • Master stock catalogue
  • Stock levels, locations, and availability
  • Stock movements, adjustments, and replenishment

Purchase order processing

  • Creation and management of supplier POs
  • Goods receipt and stock intake
  • Linking inbound stock to supplier invoices

Sales order processing

  • Orders from BigCommerce (automated) and manual entry
  • Order review, confirmation, and release
  • Picking, packing, and despatch workflows

Invoicing

  • Sales invoice generation from confirmed sales orders
  • Raised in OrderWise as part of fulfilment
Split system: OrderWise = operational ERP. Sage 50 = financial accounting. All financial transactions (sales invoices, purchase invoices, credit notes) are posted into Sage 50.
8.3 - BigCommerce → OrderWise Integration
Automated order import with human confirmation step
Quick summary: OrderWise-provided script runs every 20 minutes, polling BigCommerce for orders in Pending/Awaiting Payment. Matching orders are created in OrderWise Sales Activity. Ops must copy PO number from Comments → Customer Reference before the order proceeds to picking & despatch.

Flow

BigCommerce
Order placed
Status: Pending / Awaiting Payment
Customer form field: TES Account No.
Checkout comments: PO number
Integration script
Polls every 20 min
Matches by account no.
OrderWise
Sales Activity (Sales Card)
PO → Sales Card Comments
⚡ Human step: Copy PO → Customer Reference
→ Picking & Despatch

Field mapping

BigCommerceIntegrationOrderWise
Customer form field: Your TES Account NumberParsed by scriptCustomer → Account Number
Order status: Pending / Awaiting PaymentStatus filterEligible for import
Checkout comments / Special Instructionscustomer_messageSales Card → Comments
(Manual step - Operations)Sales Header → Customer Reference

Troubleshooting

Order not appearing in OrderWise

  • Confirm order status is Pending / Awaiting Payment
  • Check customer has a valid TES Account No.
  • Verify integration script has run recently

PO number missing

  • Confirm the customer entered it at checkout
  • Check the Sales Card Comments section
8.4 - Example Documents
Sales order lifecycle - document traceability (ISO 9001 §8.5.2)
These are illustrative examples only. Live records are controlled within operational systems (primarily OrderWise) and retrieved from there during audits. Actual file examples are linked in the Document Library.
#DocumentPurposeCreated byKey information
1QuotationFormally propose pricing, quantities, and termsSales / OperationsCustomer, products, pricing, validity, delivery terms
2Customer POCustomer confirms intent to purchaseCustomer (received)Customer PO reference, products, delivery address
3Sales order acknowledgementConfirm order received and accepted by TESOrderWise + OperationsTES SO number, customer details, items, customer PO reference
4Picking documentationInstruct warehouse on what to pickOrderWiseSO reference, product codes, quantities, stock locations
5Delivery note (signed)Confirm delivery of goodsOrderWiseSO reference, delivered items, delivery address, customer signature
6Sales invoiceFormally invoice the customerOrderWiseInvoice number, items, pricing, VAT, reference to SO and customer PO

Where a sales order is created from an accepted quotation, the sales order number matches the quotation number - providing unbroken reference and traceability from quotation through to invoicing.

8.5 - Infrastructure
Technical infrastructure supporting TES operations
⚠️
DRAFT - Requires completion

Document hosting, networking, and server infrastructure. Include backup arrangements and access controls.

SystemHosting modelProviderNotes
BigCommerceSaaSBigCommerce Inc.Vendor-managed; TES responsible for configuration
SparkLayerSaaSSparkLayer Ltd.Vendor-managed
OrderWise[Local / hosted - confirm][Confirm][Add server details]
Sage 50[Local / hosted - confirm][Confirm][Add details]
BrightHRSaaSBrightHRVendor-managed
Static Apache2 siteSelf-hosted[Confirm server/host]Apache2 on Linux
docs.tesnet.uk[Confirm][Confirm]Internal product doc system
8.6 - Runbooks
Step-by-step guides for operational procedures and incident response
⚠️
DRAFT - Requires completion

Add runbooks for critical operational procedures and failure scenarios.

RunbookTriggerPriorityStatus
BC→OW integration failureOrders not appearing in OrderWiseHighDraft in 8.3
BigCommerce outageStorefront unavailableHighNot started
OrderWise unavailableERP system downHighNot started
Duplicate order in OrderWiseSame order imported twiceMediumNot started
Customer account not linkedTES Account No. missingMediumDraft in 8.3
Stencil deployment failureTESXpress deployment rejectedMediumDraft in 8.1
Stock discrepancyPhysical count vs system mismatchMediumNot started
9.1 - Monitoring & Measurement
KPIs and performance indicators for the IMS
⚠️
DRAFT - Requires confirmation

Confirm which KPIs TES will actively measure. Set baselines before the audit where possible.

KPIStandardMeasureTargetData sourceFrequency
Order fulfilment rate9001% orders despatched on time≥95%OrderWiseMonthly
Order errors / returns9001Number of incorrect orders despatchedTrend ↓OrderWise + customer feedbackMonthly
Integration uptime9001BC→OW script running on scheduleNo missed cyclesOrderWise logsWeekly
Nonconformances raised9001, 14001, 45001Number of NCRsTrend ↓NCR register (10.1)Monthly
NCR closure rate9001, 14001, 45001% NCRs closed within target≥90%NCR register (10.1)Monthly
H&S incidents45001Reportable incidents (RIDDOR)0BrightHRMonthly
Near-miss reports45001Near-misses reportedTrend ↑ (reporting culture)BrightHR / directMonthly
Training compliance45001% staff with current mandatory training100%BrightHRQuarterly
9.2 - Internal Audit Log
Schedule and results of internal IMS audits
✓ First internal audit completed — IA-2026-01 on 30 June 2026 (full IMS). Result: largely conforms; 1 minor NC and several observations, all with assigned actions. Report linked below.
Audit refScopeDateAuditorOutcomeFindingsStatusReport
IA-2026-01Full IMS - all clauses30/06/2026Tom HallLargely conforms1 minor NC · 6 observations✓ Complete↗ Open
IA-2027-01Full IMS - annualJune 2027Tom HallScheduled
9.3 - Management Review
Periodic review of IMS effectiveness by top management
✓ First management review held — MR-2026-01 on 30 June 2026 with directors Luke & Ross Keenan and Tom Hall. Minutes linked below. Directors to sign the minutes to finalise.

Standard agenda

  1. Review of previous management review actions
  2. Changes in external and internal context relevant to the IMS
  3. Customer satisfaction and feedback
  4. IMS objectives and KPI performance (section 9.1)
  5. Nonconformances and corrective actions (section 10.1)
  6. Internal audit findings (section 9.2)
  7. Risk register review (section 6.1)
  8. Resource adequacy
  9. Opportunities for improvement
  10. Actions, owners, and target dates

Management review log

Review refDateAttendeesKey decisions / actionsStatusMinutes
MR-2026-0130/06/2026Luke Keenan, Ross Keenan, Tom Hall6 actions agreed (Fire RA, COSHH/DSEAR, 2nd first aider, PAT, racking & fire-marshal training, KPI baselines)Awaiting signature↗ Open
10.1 - Nonconformance Register
Record of nonconformances, root causes, and corrective actions
✓ In active use — findings from internal audit IA-2026-01 (30 June 2026) logged below with owners and target dates.
NCR refDate raisedStandardDescriptionRoot causeCorrective actionOwnerTarget dateStatus
NCR-2026-00130/06/202645001No premises Fire Risk Assessment in place (RRO 2005)Not yet commissionedComplete a premises Fire Risk AssessmentTom HallBefore auditOpen
OBS-2026-00130/06/202645001COSHH assessments per substance not completed (LPG, cleaning, oils, adhesives)To be carried outComplete COSHH assessments; obtain SDSTom HallBefore auditOpen
OBS-2026-00230/06/202645001DSEAR assessment for LPG forklift fuel outstandingTo be carried outComplete DSEAR assessment; secure cylinder cageTom HallBefore auditOpen

NCR process

  1. Identify - Raise an NCR as soon as a nonconformance is detected
  2. Contain - Take immediate action to control the problem if required
  3. Root cause - Investigate the root cause (not just the symptom)
  4. Correct - Implement a corrective action to address the root cause
  5. Verify - Confirm the corrective action was effective
  6. Close - Close the NCR and record the close date
  7. Review - NCRs are reviewed at each management review (9.3)
10.2 - Continual Improvement Log
Improvements to the IMS and TES operations
⚠️
DRAFT - Log template in place

Record improvement ideas and actions here from management reviews, audits, staff suggestions, or performance data.

RefDate identifiedSourceImprovement descriptionBenefitOwnerTarget dateStatus
IMP-001June 2026Audit prepComplete IMS restructure and fill documentation gapsAudit readiness; reduced knowledge riskTomJune 2026In progress
IMP-002[Date][Source][Description][Benefit][Owner][Date]Open
Office Risk Assessment
Workplace risk assessment for office areas (ISO 45001 §6.1.2 · MHSWR 1999 reg. 3)
✓ Completed by Tom Hall on 30 June 2026 (ref RA-OFF-2026-01). 10 hazards assessed; highest residual rating Moderate. Next review due 30 June 2027.

Key details

Assessment refRA-OFF-2026-01
Responsible ownerTom Hall
Review frequencyAnnual, or after significant change
StandardISO 45001 · H&S at Work Act 1974
Last completed30 June 2026
Next review due30 June 2027

Hazards assessed

  • Display screen equipment (DSE) / workstations
  • Slips, trips and falls (cables, walkways)
  • Stairs / changes of level
  • Electrical equipment and sockets
  • Fire safety and means of escape
  • Manual handling · lone working · welfare · stress · first aid

Key actions arising

  • Complete individual DSE workstation assessments
  • Introduce and record a PAT testing schedule
  • Ensure a current premises Fire Risk Assessment is in place
  • Introduce a formal lone-working check-in procedure

Assessment records

RefArea assessedDate completedAssessed byHighest ratingReview dueStatusDocument
RA-OFF-2026-01Office areas, Unit 1 Motherwell Way30/06/2026Tom HallModerate30/06/2027✓ Current↗ Open
First Aid Risk Assessment
Assessment of first aid provision and needs (ISO 45001 §8.2 · Health & Safety (First-Aid) Regs 1981)
✓ Completed by Tom Hall on 30 June 2026 (ref RA-FA-2026-01). 11 factors assessed; highest residual rating High — sole first aider with no trained cover during absence. Next review due 30 June 2027.

Key details

Assessment refRA-FA-2026-01
Responsible ownerTom Hall
Review frequencyAnnual, or on change of staff/site
StandardFirst-Aid Regs 1981 · ISO 45001
Last completed30 June 2026
Next review due30 June 2027

Current provision

  • First aiders: 1 — Tom Hall (EFAW, valid to 31/07/2028)
  • Absence cover: appointed person only
  • Kits: office, warehouse (downstairs & mezzanine), print room, kitchen
  • Burns kit: print room
  • AED (defibrillator): none on site
  • Accident history: none recorded (last 3 years)

Key actions arising

  • Train at least one additional first aider to ensure cover during absence
  • Consider providing an AED (defibrillator) and make staff aware of its location
  • Introduce monthly first-aid kit checks and a restocking log
  • Add signage showing first-aid kit locations and the current first aider

Assessment records

RefScopeDate completedAssessed byFirst aidersHighest ratingReview dueStatusDocument
RA-FA-2026-01Whole site, Unit 1 Motherwell Way30/06/2026Tom Hall1 (EFAW)High30/06/2027✓ Current↗ Open
Warehouse Risk Assessment
Workplace risk assessment for warehouse operations (ISO 45001 §6.1.2 · MHSWR 1999 reg. 3)
✓ Completed by Tom Hall on 30 June 2026 (ref RA-WH-2026-01). 14 hazards assessed; highest residual rating High (forklift operations & HGV/yard movements). Next review due 30 June 2027.

Key details

Assessment refRA-WH-2026-01
Responsible ownerTom Hall
Review frequencyAnnual, or after significant change
StandardISO 45001 · PUWER · Workplace Regs 1992
Last completed30 June 2026
Next review due30 June 2027

Hazards assessed

  • Forklift operations & pedestrian segregation
  • LPG cylinder storage & changeover
  • Manual handling · working at height / mezzanine
  • Racking & falling objects
  • HGV deliveries / loading bay / yard movements
  • COSHH · fire · PPE · lone working · electrical · first aid

Key actions arising

  • Complete a DSEAR assessment for LPG and provide a secured cylinder cage
  • Install/verify a mezzanine pallet gate; enforce no-climbing-racking rule
  • Arrange annual SEMA-approved racking inspection (see Racking Inspection)
  • Produce a yard traffic-management plan; maintain pedestrian segregation
  • Complete COSHH assessments per substance; obtain safety data sheets
  • Ensure a current premises Fire Risk Assessment is in place

Assessment records

RefArea assessedDate completedAssessed byHighest ratingReview dueStatusDocument
RA-WH-2026-01Warehouse & yard, Unit 1 Motherwell Way30/06/2026Tom HallHigh30/06/2027✓ Current↗ Open
Forklift Service
Forklift truck servicing and LOLER thorough examination (PUWER 1998 · LOLER 1998)
✓ In service — the previous forklift failed and was replaced by Bronze Mechanical Handling with a new Mitsubishi FG18N (supplied Apr 2026). LOLER thorough examination passed 27 Mar 2026 (no faults), valid to 26 Mar 2027. First service due April 2027.

Key details

Responsible ownerWarehouse manager
MachineMitsubishi FG18N (Equip 6782 · S/N CF34A 41874)
SupplierBronze Mechanical Handling Ltd
ArrangementHire — Contract 1595 · Acct THURROC4
Safe working load1800 kg at 500 mm
SuppliedApr 2026 (replaced failed unit)
Service frequencyAnnual · next service April 2027
LOLER examPassed 27/03/2026 · next due 26/03/2027

What to keep on file

  • LOLER thorough examination certificate ✓
  • Routine service reports
  • Daily / pre-use operator checks
  • Defect reports and repairs
  • Operator licences (see training records)

Service & examination records

Asset / FLTTypeDate carried outProviderOutcomeNext dueStatusDocument
FG18N (6782)LOLER thorough examination27/03/2026Bronze Mechanical Handling (CFTS — Bobby Miller)No faults detected (Record 260/38827)26/03/2027✓ Current↗ Open
FG18N (6782)Replacement machine supplied13/04/2026Bronze Mechanical HandlingNew unit in serviceService Apr 2027✓ Current↗ Invoice
FG18N (6782)Annual serviceBronze Mechanical HandlingApril 2027Not yet due
Racking Inspection
Storage racking inspections (HSG76 · SEMA / PUWER 1998)
📅
Scheduled — July 2026

A SEMA-approved expert racking inspection is booked for July 2026, ahead of the ISO audit. The report will be added here once completed.

Key details

Responsible ownerWarehouse manager (PRRS)
Expert inspectionAt least every 12 months
Visual checksRegular (e.g. weekly/monthly)
Provider[SEMA approved inspector - TBC]
Last inspectionPending — first inspection
Next inspection dueScheduled July 2026

What to keep on file

  • Annual expert inspection report
  • Internal visual inspection log
  • Damage classification (red/amber/green)
  • Repairs and component replacements
  • Safe working load (SWL) notices in place

Inspection records

RefTypeDate carried outInspected byFindings (R/A/G)Next dueStatus
RACK-01Annual expert inspection (SEMA-approved)Scheduled July 2026[Inspector - TBC]July 2026Scheduled
RACK-02Internal visual check[Date][Name][Findings]MonthlyTo start
First Aid Training Example
First aider certification records (ISO 45001 §7.2 · records held in BrightHR)
✓ Current — trained first aider in place: Thomas Hall (EFAW, valid to 31/07/2028). Add further staff certificates as people are trained, and confirm numbers meet the First Aid Risk Assessment.
First aid certificates (EFAW / FAW) are typically valid for 3 years. Track expiry to ensure continuous cover and book requalification in good time.

Key details

Responsible ownerHR / Management
Validity3 years (EFAW / FAW)
Records held inBrightHR
Linked assessmentFirst Aid Risk Assessment

What to keep on file

  • Training provider and course (EFAW / FAW)
  • Certificate copies
  • Issue and expiry dates
  • Requalification bookings

Training records

NameCourseProviderCert no.Date completedExpiryStatusCertificate
Thomas HallFAA Level 3 Emergency First Aid at Work (RQF) · 603/2080/1Training at Work Group (Nuco / First Aid Awards Ltd)NCC2794405431/07/202531/07/2028✓ Current↗ Open
[Employee name]First Aid at Work (FAW) / EFAW[Provider][Cert no.][Date][Date]To confirm[Link]
Fire Marshall Training Example
Fire marshal / warden certification records (Regulatory Reform (Fire Safety) Order 2005)
📅
Scheduled — July 2026

Tom Hall and Ross Fullbrook are booked to attend fire marshal training in July 2026, ahead of the ISO audit. Certificates will be added here and held in BrightHR once completed.

Fire marshal training is commonly refreshed every 3 years (annual refresher recommended for higher-risk sites). Ensure enough trained marshals to cover all areas and shifts.

Key details

Responsible ownerHR / Management
RefresherTypically every 3 years
Records held inBrightHR
RelatedFire risk assessment · evacuation drills

What to keep on file

  • Training provider and course
  • Certificate copies
  • Issue and refresher-due dates
  • Evacuation drill records

Training records

NameCourseProviderDate completedRefresher dueStatus
Tom HallFire Marshal / Warden[Provider - TBC]Scheduled July 2026Scheduled
Ross FullbrookFire Marshal / Warden[Provider - TBC]Scheduled July 2026Scheduled
Health & Safety Meetings
Worker consultation and H&S committee meetings (ISO 45001 §5.4 · HSCER 1996)
✓ Ongoing — H&S is a standing item in the weekly staff meeting, reviewed in depth on the first Monday of each month. The first 15 minutes of the meeting (4:45–5:30pm) are dedicated to health & safety, with all staff present.

Schedule

FrequencyMonthly — first Monday
WithinWeekly staff meeting (4:45–5:30pm)
H&S slotFirst 15 minutes of the agenda
AttendeesAll staff
Chair / ownerTom Hall

Standard agenda (H&S slot)

  1. Review of previous actions
  2. Accidents, incidents & near-misses
  3. New or revised risk assessments
  4. Inspection / service findings (forklift, racking, extinguishers)
  5. Training needs & certificate expiries
  6. Worker concerns and suggestions

Meeting log — 2026

RefDateAttendeesKey points / actionsStatus
HS-2026-0601/06/2026All staffNo new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.Held
HS-2026-0504/05/2026All staffNo new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.Held
HS-2026-0406/04/2026All staffNo new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.Held
HS-2026-0302/03/2026All staffNo new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.Held
HS-2026-0202/02/2026All staffNo new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.Held
HS-2026-0105/01/2026All staffNo new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.Held
HS-2026-0706/07/2026All staffScheduled
Duty of Care with Veolia
Waste management and duty of care (ISO 14001 §8.1 · Environmental Protection Act 1990 §34)
✓ Current — Annual Waste Transfer Note in place with Veolia ES (UK) Ltd, valid to 30 Sep 2026. Renewal due ~Sep 2026.

Key details

Waste contractorVeolia ES (UK) Ltd
Carrier registrationCBDU95537 (Environment Agency)
TES account no.93902101
Service / wasteDry Waste — EWC 200301 (non-hazardous industrial)
Collection1100 Ltr euro bin · weekly (Saturday)
Responsible ownerManagement / Operations
StandardISO 14001 · EPA 1990 Duty of Care
Valid period1 Oct 2025 – 30 Sep 2026
Next renewal due30 Sep 2026

What to keep on file

  • Signed Waste Transfer Note (valid up to 12 months) ✓
  • Pre-treatment declaration (included in WTN) ✓
  • Veolia carrier registration — verify on EA register
  • Description & EWC codes of waste streams ✓
  • Collection schedule and invoices
  • Recycling / recovery data where available

Duty of care records

DocumentReferenceValid fromValid untilWaste streamsStatusDocument
Annual Waste Transfer NoteAcct 9390210101/10/202530/09/2026EWC 200301 non-hazardous industrial✓ Current↗ Open
Pre-treatment declarationAcct 9390210101/10/202530/09/2026EWC 200301✓ Current↗ Open
Veolia waste carrier registrationCBDU95537Verify on EA registerN/A✓ Registered↗ Check
Fire Extinguisher Service
Portable fire extinguisher servicing (BS 5306-3 · Regulatory Reform (Fire Safety) Order 2005)
✓ Current — 13 portable extinguishers serviced by Assured Fire & Security on 13 May 2026, all passed (BS 5306-3:2017). Next annual service due 13 May 2027.

Key details

Responsible ownerManagement / H&S lead
ProviderAssured Fire & Security (BAFE 52046 · NSI Fire Gold)
Annual serviceEvery 12 months (BS 5306-3)
Visual checksMonthly (in-house)
Last service13 May 2026 (Stuart Sims)
Report refR-03137 · Job 4360
Units / result13 portable · all PASS
Next service due13 May 2027

What to keep on file

  • Annual service certificate ✓
  • Service report with asset list ✓
  • On-site risk assessment (Take 5) ✓
  • Extinguisher schedule (type, location, count) ✓
  • Monthly visual check log — first check 29/06/2026 (Tom Hall) ✓; continue monthly
  • Extended service / refill records (5 / 10 yearly)

Service records

DocumentDate carried outProviderUnitsOutcomeNext dueStatusDocument
Annual service certificate13/05/2026Assured Fire & Security13All PASS13/05/2027✓ Current↗ Open
Service report (asset list)13/05/2026Assured Fire & Security13All PASS13/05/2027✓ Current↗ Open
On-site risk assessment (Take 5)13/05/2026Assured Fire & SecurityRisk levels lowPer visit✓ On file↗ Open
Monthly visual check (in-house)29/06/2026Tom Hall (in-house)13All OK29/07/2026✓ Current

Extinguisher schedule

AssetTypeLocationResult (13/05/2026)
001AFFF 6.0 LWarehouse near shutterPASS
002AFFF 6.0 LRear right fire doorPASS
003AFFF 6.0 LFront entrance doorPASS
004AFFF 6.0 LUpstairs office corridorPASS
005AFFF 6.0 LFar rear right fire doorPASS
006CO2 2.0 KGWarehouse near shutterPASS
007CO2 2.0 KGRear right fire doorPASS
008CO2 2.0 KGFront entrance doorPASS
009CO2 2.0 KGFar rear right fire doorPASS
010CO2 2.0 KGUpstairs office corridorPASS
017AFFF 6.0 LRear stairs fire exitPASS
019AFFF 6.0 LMezzanine floor near stairs from warehousePASS
020CO2 2.0 KGMezzanine floor near stairs from warehousePASS
Document Library
Sales, purchasing, HR, training, and certification documents
Document Register
Master list of controlled IMS documents
DocumentIMS sectionTypeOwnerLast reviewedStatus
IMS Overview & Purpose4.1Policy / overviewManagementJan 2026Current
Scope & Boundaries4.3Scope documentManagementJan 2026Current
IMS Processes4.4Process registerOperationsJune 2026Current
Integrated Policy Statement5.2PolicyDirectorsApr 2026Current
Roles & Responsibilities5.3Responsibility matrixManagementJan 2026Current
Risk Register6.1Risk registerManagementJune 2026Draft
IMS Objectives6.2ObjectivesManagement-Draft
Training & Competence Matrix7.2Training matrixHR / OperationsJan 2026Current
System Inventory8.0Asset registerTomJan 2026Current
TESXpress - platform doc8.1Platform documentationTomJan 2026Current
OrderWise - platform doc8.2Platform documentationOperationsJan 2026Current
BC→OW Integration8.3Integration documentationTomJan 2026Current
Example Documents (sales lifecycle)8.4Process evidenceOperationsJan 2026Current
Infrastructure overview8.5InfrastructureTom-Draft
Runbooks8.6Operational runbooksOperations / Tom-Draft
KPI Framework9.1Performance dataManagementJune 2026Draft
Internal Audit Report (IA-2026-01)9.2Audit recordsTom HallJun 2026Current
Management Review Minutes (MR-2026-01)9.3Review recordsDirectorsJun 2026Current
Nonconformance Register10.1Quality recordsManagementJun 2026Current
Continual Improvement Log10.2Improvement recordsManagement-Draft