MR-2026-01 held 30 Jun 2026; minutes await director signature
10.1
Nonconformance & corrective action
✓ Documented
Register in active use; audit findings logged
10.2
Continual improvement
⚠ Draft
Improvement log to be populated
How to use this IMS: Click any row above to jump to that clause. Sections marked ⚠ Draft contain placeholder content - review and update them before the audit. Use the Document Library (sidebar) to attach and link real files.
Clause 4 › Context
4.1 - Understanding the Organisation
Internal and external issues relevant to TES and its IMS
About Thurrock Engineering Supplies
Thurrock Engineering Supplies (TES) is a UK-based distributor of engineering supplies and industrial products, operating as a trade and B2B supplier. TES serves customers primarily through its B2B eCommerce platform (TESXpress on BigCommerce) and direct trade relationships.
TES operates an Integrated Management System (IMS) covering quality management (ISO 9001), environmental management (ISO 14001), and occupational health & safety (ISO 45001). The IMS is designed to be practical, operational, and directly aligned with how TES systems and processes actually work.
Legal compliance with H&S and environmental legislation
14001, 45001
Certification body / auditors
Third-party assurance
Evidence of documented IMS, conformance with standards
9001, 14001, 45001
Local community
Neighbouring stakeholders
Minimal environmental impact from operations
14001
Logistics partners / couriers
Delivery fulfilment
Clear despatch instructions, timely handover
9001
Clause 4 › Context
4.3 - Scope & Boundaries
What the IMS covers and what it explicitly does not
In scope
The IMS covers operational systems and processes used by TES to support sales, purchasing, fulfilment, and financial posting.
Systems in scope
eCommerce platforms (BigCommerce, TESXpress)
ERP and operational systems (OrderWise)
Accounting systems used for posting and reporting (Sage 50)
Supporting infrastructure and services required to operate the above
Processes in scope
Customer ordering and order intake · Stock management and availability
Purchase order creation and goods receipt
Sales order processing and fulfilment · Invoicing and financial posting
System integrations and data flows · Manual control points and validation steps
Out of scope
People management & HR
Employment policies, training delivery records, performance management, and H&S procedures are managed in BrightHR.
Financial accounting controls
Nominal ledger, VAT, banking, reconciliation, and statutory financial reporting are managed within Sage 50.
Legal & regulatory documentation
Contracts, terms & conditions, product compliance documentation, and regulatory filings.
Vendor internal logic
Vendor-managed systems are documented at integration and usage level only.
Clause 4 › Context
4.4 - IMS Processes
The processes that make up the TES Integrated Management System
Process
Description
Key systems
Owner
IMS section
Order intake
Receiving customer orders via TESXpress or direct channels
BigCommerce, TESXpress
Operations
8.1, 8.3
Order processing
Creating, validating, and confirming sales orders in ERP
OrderWise
Operations
8.2, 8.3
Fulfilment
Picking, packing, and despatching goods to customers
OrderWise
Warehouse
8.4
Stock management
Maintaining stock levels, movements, and replenishment
OrderWise
Operations
8.2
Purchasing
Creating POs, receiving goods, managing suppliers
OrderWise
Purchasing
8.2
Invoicing
Raising sales invoices and posting to accounting
OrderWise, Sage 50
Finance
8.2, 8.4
System integration
Automated data flows between eCommerce and ERP
BigCommerce, OrderWise
Technical
8.3
HR & training
Staff management, competence, and training records
BrightHR
Management
7.2
Document management
Creating, controlling, and maintaining IMS documentation
This IMS portal
All
7.5
Performance monitoring
KPI tracking, audits, and management review
Multiple
Management
9.x
Nonconformance & improvement
Capturing issues and driving corrective action
Register (10.1)
All
10.x
Clause 5 › Leadership
5.1 - Leadership & Commitment
Top management commitment to the IMS
✓ Endorsed by Luke Keenan & Ross Keenan (Directors) on 2 April 2026, alongside the IMS policy. Reviewed annually.
Statement of commitment
TES management is committed to establishing, implementing, maintaining, and continually improving the Integrated Management System in accordance with ISO 9001, ISO 14001, and ISO 45001. This commitment includes setting and communicating the integrated policy, providing necessary resources, promoting a culture of continual improvement, and conducting management reviews.
Customer focus (ISO 9001 §5.1.2)
Maintaining accurate product and stock data across all customer-facing systems
Ensuring order-to-delivery traceability for all customer orders
Capturing and responding to customer feedback and complaints
Supporting compliance purchasing with product documentation
H&S leadership (ISO 45001 §5.1)
Taking overall accountability for prevention of work-related injury and ill health
Ensuring H&S hazards are identified and risks assessed
Ensuring workers are consulted and participate in H&S matters
Supporting incident, hazard, and near-miss reporting without fear of reprisal
Clause 5 › Leadership
5.2 - Policy
Quality, Environmental, and Health & Safety policies
✓ Approved by Luke Keenan & Ross Keenan (Directors) on 2 April 2026. Next review due 2 April 2027.
Integrated Management System Policy
TES is committed to providing high-quality engineering supplies, operating in an environmentally responsible manner, and maintaining a safe and healthy workplace for all our people.
Quality (ISO 9001)
Consistently meet or exceed customer requirements for product quality, accuracy, and delivery
Maintain documented processes that reflect how we actually operate
Continually improve systems and processes based on evidence and feedback
Environment (ISO 14001)
Minimise environmental impact in warehouse and office operations
Comply with applicable environmental legislation
Reduce waste from packaging, consumables, and operations
Health & Safety (ISO 45001)
Provide a safe and healthy workplace for all employees and visitors
Eliminate hazards and reduce H&S risks to the lowest practicable level
Consult workers on H&S matters and encourage participation
Comply with applicable health & safety legislation
Approved by: Luke Keenan & Ross Keenan (Directors) Date: 2 April 2026 Review date: 2 April 2027 (annual)
Clause 5 › Leadership
5.3 - Roles & Responsibilities
Who is responsible for what within the IMS
Role
IMS responsibility
Key systems
TES Directors
Policy approval; management review; overall accountability for IMS conformance and improvement
All
Operations (Sales)
Order processing accuracy; customer communication; PO reference handling; exception escalation
OrderWise, TESXpress
Operations (Warehouse)
Accurate picking and packing; despatch documentation; stock discrepancy reporting
OrderWise
Operations (Purchasing)
Supplier PO management; goods receipt accuracy; stock availability
Review each entry for accuracy, likelihood, and current controls before the audit. Add any missing risks.
Ref
Risk / Opportunity
Standard
Likelihood
Impact
Current control
Action required
R01
BC→OW integration failure causing missed orders
9001
Medium
High
20-min poll; deduplication logic; manual check process documented
Add automated alerting for integration failures
R02
Customer account not linked - blocking order import
9001
Medium
Medium
Precondition check; ops review process
Review customer onboarding process
R03
Incorrect product despatched due to picking error
9001
Low
High
Picking documentation from OrderWise; check before despatch
Confirm pick verification procedure is documented
R04
Key person dependency - platform knowledge held by single individual
9001
High
High
This IMS portal reduces knowledge concentration
Ensure all platform docs are current and complete
R05
Packaging waste disposal non-compliance
14001
Low
Medium
Standard waste contractor arrangements
Confirm waste contractor is licensed; document process
R06
Manual handling injury in warehouse
45001
Medium
High
Manual handling training; equipment available
Confirm training records in BrightHR
R07
Slip/trip hazard in warehouse
45001
Medium
Medium
Housekeeping standards; regular inspections
Document inspection frequency and records
O01
Improved customer satisfaction through compliance documentation on product pages
9001
-
Positive
Product Docs system (docs.tesnet.uk) in place
Measure customer feedback on document availability
O02
Reduced environmental impact through packaging optimisation
14001
-
Positive
Not yet formalised
Establish packaging review process
Clause 6 › Planning
6.2 - Objectives & Targets
Quality, environmental, and H&S objectives for TES
⚠️
DRAFT - Requires confirmation from management
Confirm measures, targets, and owners with management before the audit.
Objective
Standard
Measure
Target
Owner
Review
Maintain on-time order fulfilment
9001
% orders despatched on committed date
≥95%
Operations
Monthly
Zero order duplicates from integration
9001
Duplicate orders in OrderWise
0
Web & Platforms
Monthly
IMS documentation kept current
9001
Pages updated within 30 days of system changes
100%
All
Quarterly
Reduce packaging waste
14001
Packaging waste per order (kg)
TBD - baseline first
Warehouse
Quarterly
Zero reportable H&S incidents
45001
RIDDOR-reportable incidents
0 per year
Management
Monthly
H&S training up to date for all staff
45001
% staff with current mandatory training (BrightHR)
100%
HR
Quarterly
All nonconformances closed within target
9001, 14001, 45001
% NCRs closed within agreed timeframe
≥90%
Management
Quarterly
Clause 7 › Support
7.1 - Resources
Infrastructure, environment for operations, and monitoring resources
✓ Documented — premises, IT/cloud systems and monitoring resources identified. Detailed hosting arrangements are maintained under 8.5 Infrastructure.
7.1.3 Infrastructure
Physical
Warehouse and office premises - Unit 1 Motherwell Way, West Thurrock, Grays, RM20 3XD
Picking, packing, and despatch equipment
Manual handling equipment
IT hardware (workstations, printers)
Digital / cloud
BigCommerce platform (SaaS - vendor managed)
OrderWise ERP (locally hosted or vendor managed - confirm)
Sage 50 accounting · BrightHR (SaaS)
Static hosting for corporate site (Apache2)
docs.tesnet.uk - internal product document system
7.1.4 Environment for operations
TES maintains an appropriate working environment including clean, organised warehouse with adequate lighting, safe manual handling arrangements, and adequate workstation provision for office-based processing.
7.1.5 Monitoring & measurement resources
TES is a distributor and does not rely on measurement equipment to determine product conformity — goods are supplied to manufacturer specification with supporting documentation (see docs.tesnet.uk). Any despatch scales are used for indicative weights only and are not calibrated measurement devices. No calibration programme is therefore required; this position is reviewed annually.
Clause 7 › Support
7.2 - Competence & Training
Required competence by role; training records held in BrightHR
Training delivery, records, and certificates are managed in BrightHR. This matrix defines who needs to know what.
Competence levels
Level
Description
Awareness
General understanding of the system or process
User
Able to use the system as part of day-to-day work
Power user
Able to handle exceptions and non-standard cases
Administrator
Able to configure, maintain, or change the system
Training matrix - systems & platforms
Role
TESXpress
OrderWise
Sage 50
BrightHR
Notes
Operations (Sales)
User
User
Awareness
N/A
Order processing & customer interaction
Operations (Warehouse)
Awareness
User
N/A
N/A
Picking, packing, despatch
Operations (Purchasing)
Awareness
Power user
Awareness
N/A
PO creation & goods receipt
Finance
Awareness
User
Power user
N/A
Invoicing & posting
Management
Awareness
Awareness
Awareness
User
Oversight & approvals
Web & Platforms
Administrator
Awareness
Awareness
Awareness
System configuration & integrations
Clause 7 › Support
7.3 - Awareness
How staff are made aware of IMS requirements
✓ Documented — staff awareness is delivered through induction, the IMS portal, and the monthly H&S slot in the weekly staff meeting.
IMS awareness requirements
All TES staff should be aware of: the TES IMS policy; their contribution to IMS effectiveness; the benefits of improved performance; and the implications of not conforming with IMS requirements.
Method
Audience
Frequency
Owner
Induction training
All new starters
On joining
HR / Management
IMS portal access
All staff
Ongoing
Web & Platforms
Team meetings / briefings
Operational teams
Weekly (monthly H&S slot)
Management
Policy display
All staff
Permanent
Management
Management review outputs
Relevant staff
Quarterly
Management
Clause 7 › Support
7.4 - Communication
Internal and external communication relevant to the IMS
✓ Documented — communication channels and frequencies confirmed, including monthly H&S worker consultation in the staff meeting (ISO 45001).
Topic
Audience
Channel
Frequency
Owner
IMS policy
All staff
Portal, physical notice board
At induction; on policy change
Management
System changes & updates
Affected staff
Direct briefing / email
As required
Web & Platforms / Operations
H&S hazards and risk controls
All staff
Toolbox talks / team meetings
Monthly (H&S slot)
Management
Incident and near-miss reporting
All staff
BrightHR / direct report
Immediate on occurrence
Management
Management review outputs
Relevant staff
Meeting notes / email
Quarterly
Management
Audit findings
Relevant functions
Nonconformance register (10.1)
Post-audit
Management
Clause 7 › Support
7.5 - Documented Information
How the IMS is controlled as documented information
Document control principles
Documents are available to staff via this portal
Content is updated whenever systems change, integrations are modified, or processes are updated
Each section identifies ownership and last verification date
Live operational records are held in their source systems - not duplicated here
Category
Examples
Controlled in
IMS documentation
This portal - all sections
IMS portal
Operational records
Sales orders, invoices, delivery notes, POs
OrderWise
Financial records
Nominal ledger, VAT returns, bank reconciliations
Sage 50
HR records
Employee records, training certificates, absence records
BrightHR
Product documentation
Datasheets, UKCA declarations, certificates
docs.tesnet.uk
Audit records
Internal audit reports, nonconformances
IMS portal (9.2, 10.1)
Document library files
Example POs, quotes, certs, training records
IMS portal - Document Library
Clause 8 › Operation
8.0 - System Inventory
All TES systems, platforms, and services in scope
System
Type
Purpose
Status
Owner
TESXpress
Customer commerce platform
B2B eCommerce experience for TES customers
Active
Tom
BigCommerce
eCommerce engine
Product catalogue, checkout, order capture
Active
Tom
SparkLayer
B2B commerce engine
B2B pricing, accounts, and checkout logic
Active
Tom
OrderWise
ERP
Stock, purchasing, sales, invoicing
Active
TES
Sage 50
Accounting software
Financial accounting & VAT reporting
Active
TES Directors
Apache2 static site
Website
Corporate landing site
Active
Tom
BrightHR
HR management platform
Staff management & HR compliance
Active
TES Directors
docs.tesnet.uk
Internal web app
Product document management
Active
Tom
Clause 8 › Operation
8.1 - TESXpress
BigCommerce Stencil theme - B2B storefront at b2b.thurrockengineering.com
Compliance-driven purchasing (UKCA, EU conformity)
Fast product navigation for repeat B2B customers
Safe extension with custom apps and integrations
Deployment
# Build (validation)
stencil bundle
# Deploy to BigCommerce
stencil push
# Deploy and activate
stencil push -a
Product Documents System
TESXpress integrates with docs.tesnet.uk - attaches compliance documents to products by SKU. Documents appear automatically under the Documents tab on BigCommerce product pages.
Known issues
Stencil 401 error (channels)
Symptom:Could not fetch a list of the store channels (401)
Cause: Expired or deleted BigCommerce API token
Fix: Run stencil init and create a new API token.
Clause 8 › Operation
8.2 - OrderWise (ERP)
Core ERP for stock, purchasing, sales, and invoicing
Stock management
Master stock catalogue
Stock levels, locations, and availability
Stock movements, adjustments, and replenishment
Purchase order processing
Creation and management of supplier POs
Goods receipt and stock intake
Linking inbound stock to supplier invoices
Sales order processing
Orders from BigCommerce (automated) and manual entry
Order review, confirmation, and release
Picking, packing, and despatch workflows
Invoicing
Sales invoice generation from confirmed sales orders
Raised in OrderWise as part of fulfilment
Split system: OrderWise = operational ERP. Sage 50 = financial accounting. All financial transactions (sales invoices, purchase invoices, credit notes) are posted into Sage 50.
Clause 8 › Operation
8.3 - BigCommerce → OrderWise Integration
Automated order import with human confirmation step
Quick summary: OrderWise-provided script runs every 20 minutes, polling BigCommerce for orders in Pending/Awaiting Payment. Matching orders are created in OrderWise Sales Activity. Ops must copy PO number from Comments → Customer Reference before the order proceeds to picking & despatch.
Flow
BigCommerce
Order placed
Status: Pending / Awaiting Payment
Customer form field: TES Account No.
Checkout comments: PO number
→
Integration script
Polls every 20 min Matches by account no.
→
OrderWise
Sales Activity (Sales Card)
PO → Sales Card Comments
⚡ Human step: Copy PO → Customer Reference
→ Picking & Despatch
Field mapping
BigCommerce
Integration
OrderWise
Customer form field: Your TES Account Number
Parsed by script
Customer → Account Number
Order status: Pending / Awaiting Payment
Status filter
Eligible for import
Checkout comments / Special Instructions
customer_message
Sales Card → Comments
(Manual step - Operations)
Sales Header → Customer Reference
Troubleshooting
Order not appearing in OrderWise
Confirm order status is Pending / Awaiting Payment
Check customer has a valid TES Account No.
Verify integration script has run recently
PO number missing
Confirm the customer entered it at checkout
Check the Sales Card Comments section
Clause 8 › Operation
8.4 - Example Documents
Sales order lifecycle - document traceability (ISO 9001 §8.5.2)
These are illustrative examples only. Live records are controlled within operational systems (primarily OrderWise) and retrieved from there during audits. Actual file examples are linked in the Document Library.
TES SO number, customer details, items, customer PO reference
4
Picking documentation
Instruct warehouse on what to pick
OrderWise
SO reference, product codes, quantities, stock locations
5
Delivery note (signed)
Confirm delivery of goods
OrderWise
SO reference, delivered items, delivery address, customer signature
6
Sales invoice
Formally invoice the customer
OrderWise
Invoice number, items, pricing, VAT, reference to SO and customer PO
Where a sales order is created from an accepted quotation, the sales order number matches the quotation number - providing unbroken reference and traceability from quotation through to invoicing.
Document hosting, networking, and server infrastructure. Include backup arrangements and access controls.
System
Hosting model
Provider
Notes
BigCommerce
SaaS
BigCommerce Inc.
Vendor-managed; TES responsible for configuration
SparkLayer
SaaS
SparkLayer Ltd.
Vendor-managed
OrderWise
[Local / hosted - confirm]
[Confirm]
[Add server details]
Sage 50
[Local / hosted - confirm]
[Confirm]
[Add details]
BrightHR
SaaS
BrightHR
Vendor-managed
Static Apache2 site
Self-hosted
[Confirm server/host]
Apache2 on Linux
docs.tesnet.uk
[Confirm]
[Confirm]
Internal product doc system
Clause 8 › Operation
8.6 - Runbooks
Step-by-step guides for operational procedures and incident response
⚠️
DRAFT - Requires completion
Add runbooks for critical operational procedures and failure scenarios.
Runbook
Trigger
Priority
Status
BC→OW integration failure
Orders not appearing in OrderWise
High
Draft in 8.3
BigCommerce outage
Storefront unavailable
High
Not started
OrderWise unavailable
ERP system down
High
Not started
Duplicate order in OrderWise
Same order imported twice
Medium
Not started
Customer account not linked
TES Account No. missing
Medium
Draft in 8.3
Stencil deployment failure
TESXpress deployment rejected
Medium
Draft in 8.1
Stock discrepancy
Physical count vs system mismatch
Medium
Not started
Clause 9 › Performance Evaluation
9.1 - Monitoring & Measurement
KPIs and performance indicators for the IMS
⚠️
DRAFT - Requires confirmation
Confirm which KPIs TES will actively measure. Set baselines before the audit where possible.
KPI
Standard
Measure
Target
Data source
Frequency
Order fulfilment rate
9001
% orders despatched on time
≥95%
OrderWise
Monthly
Order errors / returns
9001
Number of incorrect orders despatched
Trend ↓
OrderWise + customer feedback
Monthly
Integration uptime
9001
BC→OW script running on schedule
No missed cycles
OrderWise logs
Weekly
Nonconformances raised
9001, 14001, 45001
Number of NCRs
Trend ↓
NCR register (10.1)
Monthly
NCR closure rate
9001, 14001, 45001
% NCRs closed within target
≥90%
NCR register (10.1)
Monthly
H&S incidents
45001
Reportable incidents (RIDDOR)
0
BrightHR
Monthly
Near-miss reports
45001
Near-misses reported
Trend ↑ (reporting culture)
BrightHR / direct
Monthly
Training compliance
45001
% staff with current mandatory training
100%
BrightHR
Quarterly
Clause 9 › Performance Evaluation
9.2 - Internal Audit Log
Schedule and results of internal IMS audits
✓ First internal audit completed — IA-2026-01 on 30 June 2026 (full IMS). Result: largely conforms; 1 minor NC and several observations, all with assigned actions. Report linked below.
Periodic review of IMS effectiveness by top management
✓ First management review held — MR-2026-01 on 30 June 2026 with directors Luke & Ross Keenan and Tom Hall. Minutes linked below. Directors to sign the minutes to finalise.
Standard agenda
Review of previous management review actions
Changes in external and internal context relevant to the IMS
Customer satisfaction and feedback
IMS objectives and KPI performance (section 9.1)
Nonconformances and corrective actions (section 10.1)
Internal audit findings (section 9.2)
Risk register review (section 6.1)
Resource adequacy
Opportunities for improvement
Actions, owners, and target dates
Management review log
Review ref
Date
Attendees
Key decisions / actions
Status
Minutes
MR-2026-01
30/06/2026
Luke Keenan, Ross Keenan, Tom Hall
6 actions agreed (Fire RA, COSHH/DSEAR, 2nd first aider, PAT, racking & fire-marshal training, KPI baselines)
Assessment of first aid provision and needs (ISO 45001 §8.2 · Health & Safety (First-Aid) Regs 1981)
✓ Completed by Tom Hall on 30 June 2026 (ref RA-FA-2026-01). 11 factors assessed; highest residual rating High — sole first aider with no trained cover during absence. Next review due 30 June 2027.
Key details
Assessment ref
RA-FA-2026-01
Responsible owner
Tom Hall
Review frequency
Annual, or on change of staff/site
Standard
First-Aid Regs 1981 · ISO 45001
Last completed
30 June 2026
Next review due
30 June 2027
Current provision
First aiders: 1 — Tom Hall (EFAW, valid to 31/07/2028)
Workplace risk assessment for warehouse operations (ISO 45001 §6.1.2 · MHSWR 1999 reg. 3)
✓ Completed by Tom Hall on 30 June 2026 (ref RA-WH-2026-01). 14 hazards assessed; highest residual rating High (forklift operations & HGV/yard movements). Next review due 30 June 2027.
Key details
Assessment ref
RA-WH-2026-01
Responsible owner
Tom Hall
Review frequency
Annual, or after significant change
Standard
ISO 45001 · PUWER · Workplace Regs 1992
Last completed
30 June 2026
Next review due
30 June 2027
Hazards assessed
Forklift operations & pedestrian segregation
LPG cylinder storage & changeover
Manual handling · working at height / mezzanine
Racking & falling objects
HGV deliveries / loading bay / yard movements
COSHH · fire · PPE · lone working · electrical · first aid
Key actions arising
Complete a DSEAR assessment for LPG and provide a secured cylinder cage
Install/verify a mezzanine pallet gate; enforce no-climbing-racking rule
Arrange annual SEMA-approved racking inspection (see Racking Inspection)
Produce a yard traffic-management plan; maintain pedestrian segregation
Complete COSHH assessments per substance; obtain safety data sheets
Ensure a current premises Fire Risk Assessment is in place
✓ In service — the previous forklift failed and was replaced by Bronze Mechanical Handling with a new Mitsubishi FG18N (supplied Apr 2026). LOLER thorough examination passed 27 Mar 2026 (no faults), valid to 26 Mar 2027. First service due April 2027.
A SEMA-approved expert racking inspection is booked for July 2026, ahead of the ISO audit. The report will be added here once completed.
Key details
Responsible owner
Warehouse manager (PRRS)
Expert inspection
At least every 12 months
Visual checks
Regular (e.g. weekly/monthly)
Provider
[SEMA approved inspector - TBC]
Last inspection
Pending — first inspection
Next inspection due
Scheduled July 2026
What to keep on file
Annual expert inspection report
Internal visual inspection log
Damage classification (red/amber/green)
Repairs and component replacements
Safe working load (SWL) notices in place
Inspection records
Ref
Type
Date carried out
Inspected by
Findings (R/A/G)
Next due
Status
RACK-01
Annual expert inspection (SEMA-approved)
Scheduled July 2026
[Inspector - TBC]
—
July 2026
Scheduled
RACK-02
Internal visual check
[Date]
[Name]
[Findings]
Monthly
To start
Health & Safety › Training
First Aid Training Example
First aider certification records (ISO 45001 §7.2 · records held in BrightHR)
✓ Current — trained first aider in place: Thomas Hall (EFAW, valid to 31/07/2028). Add further staff certificates as people are trained, and confirm numbers meet the First Aid Risk Assessment.
First aid certificates (EFAW / FAW) are typically valid for 3 years. Track expiry to ensure continuous cover and book requalification in good time.
Key details
Responsible owner
HR / Management
Validity
3 years (EFAW / FAW)
Records held in
BrightHR
Linked assessment
First Aid Risk Assessment
What to keep on file
Training provider and course (EFAW / FAW)
Certificate copies
Issue and expiry dates
Requalification bookings
Training records
Name
Course
Provider
Cert no.
Date completed
Expiry
Status
Certificate
Thomas Hall
FAA Level 3 Emergency First Aid at Work (RQF) · 603/2080/1
Training at Work Group (Nuco / First Aid Awards Ltd)
Fire marshal / warden certification records (Regulatory Reform (Fire Safety) Order 2005)
📅
Scheduled — July 2026
Tom Hall and Ross Fullbrook are booked to attend fire marshal training in July 2026, ahead of the ISO audit. Certificates will be added here and held in BrightHR once completed.
Fire marshal training is commonly refreshed every 3 years (annual refresher recommended for higher-risk sites). Ensure enough trained marshals to cover all areas and shifts.
Key details
Responsible owner
HR / Management
Refresher
Typically every 3 years
Records held in
BrightHR
Related
Fire risk assessment · evacuation drills
What to keep on file
Training provider and course
Certificate copies
Issue and refresher-due dates
Evacuation drill records
Training records
Name
Course
Provider
Date completed
Refresher due
Status
Tom Hall
Fire Marshal / Warden
[Provider - TBC]
Scheduled July 2026
—
Scheduled
Ross Fullbrook
Fire Marshal / Warden
[Provider - TBC]
Scheduled July 2026
—
Scheduled
Health & Safety › Consultation
Health & Safety Meetings
Worker consultation and H&S committee meetings (ISO 45001 §5.4 · HSCER 1996)
✓ Ongoing — H&S is a standing item in the weekly staff meeting, reviewed in depth on the first Monday of each month. The first 15 minutes of the meeting (4:45–5:30pm) are dedicated to health & safety, with all staff present.
Schedule
Frequency
Monthly — first Monday
Within
Weekly staff meeting (4:45–5:30pm)
H&S slot
First 15 minutes of the agenda
Attendees
All staff
Chair / owner
Tom Hall
Standard agenda (H&S slot)
Review of previous actions
Accidents, incidents & near-misses
New or revised risk assessments
Inspection / service findings (forklift, racking, extinguishers)
Training needs & certificate expiries
Worker concerns and suggestions
Meeting log — 2026
Ref
Date
Attendees
Key points / actions
Status
HS-2026-06
01/06/2026
All staff
No new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.
Held
HS-2026-05
04/05/2026
All staff
No new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.
Held
HS-2026-04
06/04/2026
All staff
No new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.
Held
HS-2026-03
02/03/2026
All staff
No new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.
Held
HS-2026-02
02/02/2026
All staff
No new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.
Held
HS-2026-01
05/01/2026
All staff
No new H&S issues. Routine safety checks reviewed — material handling and offloading of delivery vehicles.
Held
HS-2026-07
06/07/2026
All staff
—
Scheduled
Environmental › Waste
Duty of Care with Veolia
Waste management and duty of care (ISO 14001 §8.1 · Environmental Protection Act 1990 §34)
✓ Current — Annual Waste Transfer Note in place with Veolia ES (UK) Ltd, valid to 30 Sep 2026. Renewal due ~Sep 2026.
Key details
Waste contractor
Veolia ES (UK) Ltd
Carrier registration
CBDU95537 (Environment Agency)
TES account no.
93902101
Service / waste
Dry Waste — EWC 200301 (non-hazardous industrial)
Collection
1100 Ltr euro bin · weekly (Saturday)
Responsible owner
Management / Operations
Standard
ISO 14001 · EPA 1990 Duty of Care
Valid period
1 Oct 2025 – 30 Sep 2026
Next renewal due
30 Sep 2026
What to keep on file
Signed Waste Transfer Note (valid up to 12 months) ✓
Pre-treatment declaration (included in WTN) ✓
Veolia carrier registration — verify on EA register
Portable fire extinguisher servicing (BS 5306-3 · Regulatory Reform (Fire Safety) Order 2005)
✓ Current — 13 portable extinguishers serviced by Assured Fire & Security on 13 May 2026, all passed (BS 5306-3:2017). Next annual service due 13 May 2027.
Key details
Responsible owner
Management / H&S lead
Provider
Assured Fire & Security (BAFE 52046 · NSI Fire Gold)